Approximate time required: 2.5 hours.
Note: this page is for the optional inflatable floor inserts available for the Atlin, Skeena, and Telkwa packraft models. Instructions for the Chilko inflatable floors are posted here.
Questions? Leave a comment below.
0 Comments