Home › Forums › DIY Packrafts › DIY Packraft Photos › Reply To: DIY Packraft Photos
Couple of weeks ago I finished my two packrafts! Telkwa and 2-Person.
It was awesome to build these. I really enjoyed it! The Telkwa was the first and it took me about 3 weeks. I was not very fast, but was afraid of doing any mistakes. I did some, but nothing major. Had some very minor leaks at the zipper.

The second (2-Person) took me about 1,5 weeks. It did not have a wrap around floor, so for me it was much easier to build. And I learned quite a lot with the telkwa. The 2-Person had no leaks and was airtight right from the beginning.


For both packrafts I used the Leather Iron and an hot air soldering station (858D). With the hot station I could weld the seamstrips very consistently. In my tests the welds are very strong and mostly without any airbubbles.

When Matt is back from his trip I will order the Ultralight and Skeena as well!